  • Faculty of Pharmacy - PV System (6)

    Under the Med-Solar project of the construction of PV hybrid power plants, we increased the capacity of power plant by 40KWp to get major impact on fuel savings and a major reduction of contracted power for final beneficiary. The system was installed on the roof of pharmacy college.

  • Training Session and a Workshop - 21-22 Dec 2015 (34)

    On Monday, December 21st, 2015 the Energy Research Centre at An-Najah held a training session and a workshop on promoting and implementing innovative solar technologies in public facilities and buildings as part of the MED-SOLAR project. The sessions were over two days from December 21-22, 2015.

  • PV Installation (24)

    Starting the Steel Structures and PV Panels Installation for the Construction of the Hybrid PV System at An-Najah University Hospital

  • Civil work (14)

    Start Preparing the project site by conditioning the ground where the PV generator will be installed, to rectify the project land to fit with the installation.

  • Pre-installation site visit by the contractor (13)

    The contractor visit the installation site of solar PV system in ANU university hospital with Energy Research Center (ERC) team to elaborate a strategy for civil works of project site where the PV generators will be installed, and selecting a suitable location for electrical room.

  • Visit of TTA for the ANU Hospital project site (10)