Gallery
-
Faculty of Pharmacy - PV System (6)
Under the Med-Solar project of the construction of PV hybrid power plants, we increased the capacity of power plant by 40KWp to get major impact on fuel savings and a major reduction of contracted power for final beneficiary. The system was installed on the roof of pharmacy college.
-
Training Session and a Workshop - 21-22 Dec 2015 (34)
On Monday, December 21st, 2015 the Energy Research Centre at An-Najah held a training session and a workshop on promoting and implementing innovative solar technologies in public facilities and buildings as part of the MED-SOLAR project. The sessions were over two days from December 21-22, 2015.
-
PV Installation (24)
Starting the Steel Structures and PV Panels Installation for the Construction of the Hybrid PV System at An-Najah University Hospital
-
Civil work (14)
Start Preparing the project site by conditioning the ground where the PV generator will be installed, to rectify the project land to fit with the installation.
-
Pre-installation site visit by the contractor (13)
The contractor visit the installation site of solar PV system in ANU university hospital with Energy Research Center (ERC) team to elaborate a strategy for civil works of project site where the PV generators will be installed, and selecting a suitable location for electrical room.
-
Visit of TTA for the ANU Hospital project site (10)
Trama TecnoAmbiental (TTA), the leading partner, visited the An-Najah National University Hospital